ASDA roundabout.. 2020
Posted by F4p from Aberdare on the 6th April 2020
So is this the 3rd or 4th time that the roundabout has had to be re-engineered?And at what expense?Were the original plans drawn in crayon?
- Log in to post comments
Posted by F4p from Aberdare on the 6th April 2020